{"id":1706,"date":"2026-09-05T15:40:36","date_gmt":"2026-09-05T07:40:36","guid":{"rendered":"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-adu-accessory-dwelling-units\/"},"modified":"2026-09-05T15:40:36","modified_gmt":"2026-09-05T07:40:36","slug":"xps-waterproof-backer-board-adu-accessory-dwelling-units","status":"publish","type":"post","link":"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-adu-accessory-dwelling-units\/","title":{"rendered":"XPS Waterproof Backer Board for ADUs &#038; Accessory Dwelling Units: The Fast, Lightweight Wet-Room Solution (2026)"},"content":{"rendered":"<h2>Why ADUs Are the Fastest-Growing Wet-Room Market \u2014 and Where XPS Fits<\/h2>\n<p>Accessory dwelling units (ADUs) have moved from a niche zoning curiosity to one of the fastest-growing segments of North American residential construction. California alone permitted more than 25,000 ADUs in a single recent year, and states from Washington and Oregon to New York, Colorado, and Massachusetts have followed with zoning reforms that make detached, attached, and interior ADUs dramatically easier to permit. Nearly every ADU \u2014 whether it is a backyard cottage, a garage conversion, or a junior ADU carved out of an existing home \u2014 contains at least one bathroom. That bathroom is the single most schedule-sensitive, inspection-heavy, and failure-prone room in the project.<\/p>\n<p>This is exactly where <strong>XPS (extruded polystyrene) waterproof backer board<\/strong> earns its place. Lighter than cement board, faster than a liquid membrane, and rigid enough to tile directly onto, XPS backer board is increasingly the default wet-room substrate for ADU builders who need to hit aggressive timelines, keep loads off small foundations, and pass plumbing and waterproofing inspections on the first attempt.<\/p>\n<p>In this guide we cover why ADU wet rooms are uniquely demanding, how XPS solves each challenge, a head-to-head comparison against cement board and liquid membranes, application details across the four main ADU types, real cost and schedule math, and a code-compliance checklist. If you are new to XPS backer board fundamentals, start with our <a href=\"https:\/\/www.biaotuoboard.com\/waterproof-backer-board-complete-guide-xps-tile-substrates\/\">complete guide to XPS tile substrates<\/a> before diving in here.<\/p>\n<h2>The Five ADU Challenges XPS Waterproof Backer Board Solves<\/h2>\n<p>ADUs concentrate almost every construction constraint into a small footprint. Understanding these constraints explains why a rigid foam backer board outperforms traditional substrates in this specific context.<\/p>\n<h3>1. Compressed Schedules<\/h3>\n<p>ADU builders bid against each other on schedule. A liquid-applied waterproofing membrane needs a clean, dry substrate, often a primer, and a 24\u201348 hour cure window before flood testing. A traditional mortar-bed shower adds days of cure time and requires a skilled mud-setter. XPS backer board is mechanically fastened to the framing, seams are sealed with the manufacturer&#8217;s proprietary sealant and reinforcing tape, and the surface is tile-ready immediately \u2014 no cure time, no waiting for a membrane to dry. For a contractor running multiple ADUs in sequence, this alone can save a full week per bathroom.<\/p>\n<h3>2. Lightweight Panels on Light Structures<\/h3>\n<p>Detached ADUs are frequently built on pier-and-beam or thin slab foundations with engineered, lightweight framing. A 3\u00d75 ft sheet of XPS backer board can weigh under 10 lb, versus 40\u201360 lb for a comparable cement board panel. That weight difference matters three ways: it reduces dead load on the structure, it lets a single worker carry and place panels without a helper, and it cuts freight and jobsite handling. For a two-person ADU crew, lightweight panels are a genuine productivity multiplier, not a marginal convenience.<\/p>\n<h3>3. Curbless, Accessible Showers Without Mud<\/h3>\n<p>Many ADUs are built for aging parents or as rental units marketed toward universal design. A curbless shower is often the deciding feature. Traditional curbless construction relies on recessed subfloors and a thick, sloped mortar bed \u2014 heavy, slow, and skill-dependent. XPS systems offer pre-sloped shower trays and thin panel profiles that make a zero-threshold shower achievable on a standard ADU floor assembly. See our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-curbless-showers-barrier-free-bathrooms\/\">curbless shower and barrier-free guide<\/a> for the full detail.<\/p>\n<h3>4. Garage and Interior Conversions with Imperfect Framing<\/h3>\n<p>Garage conversions and JADUs almost never have perfectly plumb, flat, on-center framing. XPS panels can be shimmed, stacked, and trimmed far more forgivingly than rigid cement board, and their slight surface give tolerates minor framing irregularity while still meeting the flatness required for large-format tile. This reduces the \u00absurprise\u00bb framing corrections that eat ADU budgets on retrofit work.<\/p>\n<h3>5. Moisture in Unconditioned, Slab-on-Grade Spaces<\/h3>\n<p>A detached ADU on a slab, or a garage conversion, brings ground moisture and thermal bridging into the envelope. Because XPS is a closed-cell foam with near-zero water absorption and a measurable R-value, it acts as both a substrate and a thermal\/moisture break in one layer. Traditional cement board is a thermal bridge and must be paired with a separate membrane; XPS does more with fewer layers. For the insulation math, review our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-thermal-performance-radiant-floor-heating\/\">thermal performance and R-value guide<\/a>.<\/p>\n<h2>XPS vs. Cement Board vs. Liquid Membrane for ADU Bathrooms<\/h2>\n<p>For a small, fast, inspection-sensitive ADU bathroom, the substrate decision drives cost, schedule, and risk. Here is the head-to-head.<\/p>\n<table>\n<thead>\n<tr>\n<th>Factor<\/th>\n<th>XPS Waterproof Backer Board<\/th>\n<th>Cement Board<\/th>\n<th>Liquid Membrane<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Weight (3\u00d75 ft panel)<\/td>\n<td>~5\u201310 lb<\/td>\n<td>40\u201360 lb<\/td>\n<td>N\/A (roll-on)<\/td>\n<\/tr>\n<tr>\n<td>Cure \/ dry time<\/td>\n<td>None \u2014 tile-ready immediately<\/td>\n<td>None (but still needs membrane)<\/td>\n<td>24\u201348 hr before flood test<\/td>\n<\/tr>\n<tr>\n<td>Waterproofing<\/td>\n<td>Inherent (closed-cell + coating)<\/td>\n<td>Requires separate membrane<\/td>\n<td>Inherent (if applied perfectly)<\/td>\n<\/tr>\n<tr>\n<td>Thermal value<\/td>\n<td>R \u2248 2.5 per inch<\/td>\n<td>~0 (thermal bridge)<\/td>\n<td>None<\/td>\n<\/tr>\n<tr>\n<td>Skill sensitivity<\/td>\n<td>Low\u2013moderate<\/td>\n<td>Moderate<\/td>\n<td>High (thickness-critical)<\/td>\n<\/tr>\n<tr>\n<td>Curbless capability<\/td>\n<td>Excellent (pre-sloped trays)<\/td>\n<td>Requires mud bed<\/td>\n<td>Possible, harder<\/td>\n<\/tr>\n<tr>\n<td>Silica dust<\/td>\n<td>None (cut with knife)<\/td>\n<td>Significant<\/td>\n<td>None<\/td>\n<\/tr>\n<tr>\n<td>Best fit for ADU<\/td>\n<td><strong>Ideal<\/strong><\/td>\n<td>Traditional, slower<\/td>\n<td>Cheap but slow\/risky<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The pattern is consistent: liquid membranes look cheapest on material cost but are the most schedule- and skill-sensitive, while cement board carries the lowest material cost but demands a second waterproofing layer and a separate route to curbless design. XPS bundles substrate, waterproofing, and thermal break into one fast-installed panel \u2014 the profile that best matches an ADU&#8217;s economics.<\/p>\n<h2>Applying XPS Across the Four Main ADU Types<\/h2>\n<h3>Detached ADU (Backyard Cottage)<\/h3>\n<p>A new detached unit gives you clean framing and full control. On a slab-on-grade foundation, specify XPS panels over wood or steel studs at 16 in. o.c. (12 in. for steam or heavy-tile walls), use the manufacturer&#8217;s washer-and-screw fastening pattern, and install a pre-sloped XPS shower tray for a curbless entry. Pay attention to the slab-to-wall transition: run the waterproofing detail up the wall and down onto the tray so ground moisture cannot migrate behind the assembly. This is the same below-grade logic covered in our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-basements-below-grade-applications\/\">basement and below-grade guide<\/a>.<\/p>\n<h3>Garage Conversion ADU<\/h3>\n<p>Garage conversions combine a slab with masonry or mixed framing and often have a low ceiling and an out-of-level floor. XPS is forgiving of these irregularities: shim panels to establish flat, plumb planes, use thin panels to preserve ceiling height, and take advantage of the lightweight material when hoisting panels in tight spaces. Because garage slabs often lack a vapor barrier, treat the entire wet-room floor as a below-grade assembly and integrate a pre-sloped tray over a properly detailed substrate. Confirm existing framing meets the deflection limits in our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-substrate-preparation-framing-guide\/\">substrate and framing guide<\/a> before tiling.<\/p>\n<h3>Junior ADU (JADU) \/ Interior Conversion<\/h3>\n<p>A JADU is a small conversion inside an existing home \u2014 often a bedroom with an en-suite added, or a shared-wall partition. Here the driver is minimizing disruption to an occupied house. XPS wins on low dust (no silica-generating cement board cuts), quiet, fast installation, and thin profiles that preserve square footage in a compact bathroom. A powder-room-turned-full-bath is a common JADU scope; XPS panels handle the tub or shower surround without a mortar bed.<\/p>\n<h3>Basement ADU<\/h3>\n<p>Below-grade ADUs face continuous moisture pressure from the outside. XPS&#8217;s closed-cell core and low vapor permeability make it a natural choice, but it must be paired with correct exterior waterproofing and interior drainage \u2014 XPS is not a substitute for exterior waterproofing. Review our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-basements-below-grade-applications\/\">dedicated basement guide<\/a> and the <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-mold-mildew-resistance-guide\/\">mold and mildew resistance guide<\/a> for the full moisture-control strategy.<\/p>\n<h2>The ADU Builder&#8217;s ROI: Time and Cost in Real Numbers<\/h2>\n<p>For a typical 5\u00d78 ft ADU bathroom, here is how the substrate choice changes the economics.<\/p>\n<table>\n<thead>\n<tr>\n<th>Line item<\/th>\n<th>XPS Backer Board<\/th>\n<th>Cement Board + Membrane<\/th>\n<th>Liquid Membrane over CBU<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Material (walls + floor + tray)<\/td>\n<td>$1,100\u2013$1,900<\/td>\n<td>$700\u2013$1,100<\/td>\n<td>$900\u2013$1,500<\/td>\n<\/tr>\n<tr>\n<td>Labor (2-person crew)<\/td>\n<td>1.5\u20132.5 days<\/td>\n<td>3\u20134 days<\/td>\n<td>3.5\u20135 days<\/td>\n<\/tr>\n<tr>\n<td>Cure \/ wait time<\/td>\n<td>0 days<\/td>\n<td>0 days (membrane adds)<\/td>\n<td>1\u20132 days<\/td>\n<\/tr>\n<tr>\n<td>Flood-test ready<\/td>\n<td>Immediately<\/td>\n<td>After membrane cure<\/td>\n<td>After 48 hr cure<\/td>\n<\/tr>\n<tr>\n<td>Typical installed cost<\/td>\n<td>$12\u2013$20 \/ sq ft<\/td>\n<td>$13\u2013$18 \/ sq ft<\/td>\n<td>$14\u2013$24 \/ sq ft<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The material premium for XPS is real, but it is returned through labor and schedule: a week saved on one bathroom, multiplied across a multi-ADU pipeline, is worth more than the panel-cost delta. For a detailed cost model across systems, see our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-vs-cement-board-cost-roi\/\">XPS vs. cement board cost and ROI comparison<\/a> and the <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-vs-liquid-sheet-membranes\/\">system comparison against liquid and sheet membranes<\/a>.<\/p>\n<h2>Code, Compliance, and Accessibility for ADU Wet Rooms<\/h2>\n<p>ADU bathrooms must satisfy the same plumbing and building codes as primary dwellings, plus the accessibility expectations that increasingly come with ADU marketing. Key points to confirm with your AHJ:<\/p>\n<ul>\n<li><strong>Waterproofing standard:<\/strong> Follow the backer board manufacturer&#8217;s published system (fastening schedule, seam sealant, corner and penetration reinforcement). This is your primary path to a compliant, warrantied assembly.<\/li>\n<li><strong>Shower pan slope:<\/strong> 1\/4 in. per foot minimum to drain; pre-sloped XPS trays provide this consistently without hand-floating a mud bed.<\/li>\n<li><strong>Curbless accessibility:<\/strong> If the ADU targets universal design, align threshold heights and clearances with ANSI A117.1 or local accessibility provisions. See our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-curbless-showers-barrier-free-bathrooms\/\">curbless shower guide<\/a> for the specifics.<\/li>\n<li><strong>Fire and thermal:<\/strong> For detached units, foam insulation products are governed by IBC Chapter 26 \/ IRC R316 requirements (thermal or ignition barriers where applicable). Confirm your panel&#8217;s listing and the assembly&#8217;s fire rating with our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-fire-resistance-code-compliance\/\">fire resistance and code compliance guide<\/a>.<\/li>\n<li><strong>Ventilation:<\/strong> Small, tight ADU bathrooms need mechanical exhaust; size the fan to the room and duct it properly to avoid the humidity buildup that drives mold.<\/li>\n<\/ul>\n<h2>Step-by-Step: XPS in an ADU Bathroom Build<\/h2>\n<ol>\n<li><strong>Verify framing.<\/strong> Confirm stud spacing, flatness (within 1\/8 in. over 8 ft for large tile), and blocking behind grab bars, glass doors, and benches. Reference our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-substrate-preparation-framing-guide\/\">framing preparation guide<\/a>.<\/li>\n<li><strong>Rough in plumbing and blocking.<\/strong> Complete supply, drain, and valve rough-in before closing walls; add blocking now, not later.<\/li>\n<li><strong>Cut panels.<\/strong> Score-and-snap with a utility knife for straight cuts; use a fine saw for curves and valve openings. See the <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-cutting-tools-techniques-guide\/\">cutting and fabrication guide<\/a>.<\/li>\n<li><strong>Fasten panels.<\/strong> Use the manufacturer&#8217;s washers and screws at the specified spacing, keeping edges back from inside corners as directed.<\/li>\n<li><strong>Seal seams and penetrations.<\/strong> Apply proprietary sealant and reinforcing tape to all seams, inside corners, and penetrations (valve, drain, curbless transition). This is the step where most failures originate \u2014 do not rush it.<\/li>\n<li><strong>Install the shower tray.<\/strong> Set the pre-sloped tray level and bonded per instructions; run the waterproofing detail up the walls and onto the tray.<\/li>\n<li><strong>Flood test.<\/strong> Plug the drain and hold water for the required period (commonly 24 hr, or per manufacturer) before tiling.<\/li>\n<li><strong>Tile and grout.<\/strong> Use a modified thin-set and grout compatible with XPS panels; verify the manufacturer&#8217;s adhesive list in our <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-tile-adhesive-compatibility-guide\/\">tile and adhesive compatibility guide<\/a>.<\/li>\n<\/ol>\n<h2>Common ADU Wet-Room Mistakes (and How XPS Helps Avoid Them)<\/h2>\n<ul>\n<li><strong>Rushing the flood test.<\/strong> Liquid membranes tempt builders to skip or shorten the test because of cure time. XPS has no cure window, so there is no excuse to skip the test.<\/li>\n<li><strong>Forgetting grab-bar and door blocking.<\/strong> Retrofit conversions expose missing blocking after walls are closed. Plan blocking during the framing step, before panels go up.<\/li>\n<li><strong>Over-tightening fasteners.<\/strong> Overtorqued screws can dimple or crack panels and compromise the seal. Use manufacturer washers and torque discipline.<\/li>\n<li><strong>Treating the slab-to-wall junction casually.<\/strong> On slab ADUs and garage conversions, this joint is the number-one leak path. Detail it as a below-grade assembly.<\/li>\n<li><strong>Mixing systems.<\/strong> Don&#8217;t pair one brand&#8217;s board with another&#8217;s sealant or tape. Use the full, single-manufacturer system for a valid warranty.<\/li>\n<\/ul>\n<h2>Frequently Asked Questions<\/h2>\n<h3>Is XPS backer board strong enough for an ADU bathroom?<\/h3>\n<p>Yes. XPS backer boards are engineered for direct tile application and meet the structural requirements for walls, tub\/shower surrounds, and shower floors when installed per the manufacturer&#8217;s system. The closed-cell core and bonded facing provide the rigidity and bonding surface tile requires.<\/p>\n<h3>Can I use XPS backer board in a garage conversion with an uneven slab?<\/h3>\n<p>Yes \u2014 this is one of its strengths. Shim panels and use pre-sloped trays over a properly prepared substrate. Verify the slab has adequate drainage and, where ground moisture is present, treat the assembly as below-grade per our basement guide.<\/p>\n<h3>Does XPS backer board work for a curbless, accessible ADU shower?<\/h3>\n<p>Yes, and it is often the easiest route to a zero-threshold shower on a standard ADU floor, thanks to thin panels and pre-sloped trays that avoid a thick mortar bed. Confirm threshold and clearances with local accessibility provisions.<\/p>\n<h3>How much faster is XPS than a liquid membrane in an ADU?<\/h3>\n<p>Typically one to two days per bathroom \u2014 the membrane cure window is eliminated entirely, and panel installation is quicker than mud-bed or cement-board-plus-membrane methods.<\/p>\n<h3>Do I still need a vapor barrier behind XPS panels in an ADU?<\/h3>\n<p>Follow the manufacturer&#8217;s system. In most interior wet-room applications XPS acts as the vapor retarder, so a separate polyethylene layer is neither required nor recommended (it can create a double vapor barrier). For below-grade and exterior-wall conditions, confirm the correct assembly with your supplier and AHJ.<\/p>\n<h2>Conclusion: XPS Is the Substrate That Matches ADU Economics<\/h2>\n<p>ADUs succeed or fail on schedule, weight, and inspection risk \u2014 not on raw material cost. XPS waterproof backer board aligns with those economics better than any traditional alternative: it is light enough for a small crew, fast enough to eliminate cure windows, forgiving enough for retrofit framing, and inherently waterproof and insulating. For the ADU builder or homeowner specifying a bathroom in a backyard cottage, garage conversion, JADU, or basement unit, XPS is the high-leverage choice.<\/p>\n<p>To build out your ADU wet-room knowledge further, continue through our series: start with the <a href=\"https:\/\/www.biaotuoboard.com\/waterproof-backer-board-complete-guide-xps-tile-substrates\/\">complete guide<\/a>, then the <a href=\"https:\/\/www.biaotuoboard.com\/install-xps-waterproof-backer-board-step-by-step-guide\/\">step-by-step installation guide<\/a>, the <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-buyers-guide-brand-comparison\/\">buyer&#8217;s guide and brand comparison<\/a>, and the <a href=\"https:\/\/www.biaotuoboard.com\/xps-waterproof-backer-board-commercial-applications-hotels-hospitals\/\">commercial applications guide<\/a> for multi-unit ADU and small-multifamily parallels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How XPS waterproof backer board solves the biggest ADU challenges \u2014 fast schedules, lightweight panels, no membrane cure time, and accessible curbless showers. Covers detached ADUs, garage conversions, JADUs, basement units, code compliance, and cost\/time savings vs. cement board and liquid membranes.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1706","post","type-post","status-publish","format-standard","hentry","category-technical-resources"],"_links":{"self":[{"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/posts\/1706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/comments?post=1706"}],"version-history":[{"count":0,"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/posts\/1706\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/media?parent=1706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/categories?post=1706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.biaotuoboard.com\/wp-json\/wp\/v2\/tags?post=1706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}